01The first line of defense.
Your TPO or PVC membrane forms the exposed roofing surface. Overlaps are heat-welded, while compatible flashings address edges, curbs and penetrations.
The focus: seams, terminations and water management.
02Performance below the surface.
Insulation and, where specified, cover board support the membrane assembly. Insulation thickness and tapered layouts are selected around the building's needs and drainage plan.
The focus: thermal performance and a suitable substrate.
03It starts with a sound deck.
The deck supports the roof system. Its condition and attachment requirements need to be assessed before covering it with a new assembly.
The focus: a dependable foundation for the specified system.